Polaniec Power Station

GDF Suez, one of the leading energy producers in the world, built a state-of-the-art biomass power plant supplying over 200 MWe of renewable power to Poland’s power grid since 2012. The plant features Sumitomo SHI FW’s state of the art advanced Bio-CFB boiler utilizing cutting edge design features and materials to efficiently and cleanly produce large scale power from a broad spectrum of wood biomass and difficult-to-burn agricultural crops and byproducts.

  • The 100% biomass fired 225 MWe gross / 205 MWe net circulating fluidized bed (CFB) boiler has been running reliably since November 2012.
  • Our team helped the plant reach commercial operation six weeks ahead of schedule.

Project Summary

Location: Polaniec, Poland

Customer: GDF Suez Energia Polska

Duration: 2010-2012

Scope: EPC of boiler island and biomass fuel yard

Plant Electrical Output (Gross/Net): 225 MWe / 205 MWe

Net Plant Efficiency (LHV/HHV): 36.5/31.4%

Steam Flow (SH/RH): 569/486 tph — 1251/1071 kpph

Steam Pressure (SH/RH): 126/19 barg — 1828/276 psig

Steam Temperature (SH/RH): 535/535°C — 995/995 °F

Feedwater Temperature: 242°C — 468°F

Fuel: Wood residues, agro biomass